Bramley Road Closures 16th - 19th July 2014

Works Start: 16 Jul
End: 17 Jul 

Medium impact, delays possible

Location : junction with Silchester Road, Bramley. 2 way lights required.
Description : Highway Drainage Cleaning and Investigation. Clear gullies / weir kerbs both sides of carriageway. Jet main lines to outfalls and carry out camera survey.
Current status: Advanced planning
Traffic lights, etc: Traffic control (two-way signals)
Queries should be addressed to Hampshire County Council quoting reference FF40111016467B                    

http://roadworks.org/?35516948

Works Start: 17 Jul
End: 19 Jul 

Medium impact, delays possible

Location : 
Near junction with The Smithy
Description : Carriageway patching
Current status: Advanced planning
Traffic lights, etc: Traffic control (two-way signals)
Queries should be addressed to Hampshire County Council quoting reference FF40111017128B                    

 
Works Start: 16 Jul
End: 17 Jul 
 
High impact, delays likely                   
 
Location : Local to Malborough house, Silchester Road, Bramley. 2 way lights required.
Description: Highway Drainage Cleaning and Investigation. Clear gullies / weir kerbs both ...
Current status: Advanced planning
Traffic lights, etc: Traffic control (two-way signals)

Queries should be addressed to Hampshire County Council quoting reference FF40111016467                    

http://roadworks.org/?35408428

Bookings Diary

Clift Meadow


Village Hall

Find us on Facebook

BramleyPC Twitter Feed