Roadworks Update: 15th July 2019

  • Print
User Rating:  / 0
PoorBest 

Vyne Road, Sherborne St John, Hampshire

17 July — 17 July

   

Delays likely Road closure

 

Works location: from jct Silchester Road to Morgaston Road

   

Works description: Carriageway haunching works

   

Responsibility for works: Hampshire

   

Current status: Forward planning

   

Works reference: FF110B873

   

Bramley Road, Sherfield-on-loddon, Hampshire

15 July — 17 July

   

Delays possible Traffic control (multi-way signals)

 

Works location: Bramley Road, Sherfield-on-Loddon. At speed change when entering Bramley road from A33.

   

Works description: Installation of 30mph roundel 4.3m height (reference 1065) in carriageway at speed change, adjacent to 30mph sign. Install a new warning sign (Sign ref 562) with 'Pedestrians crossing' plate underneath, below existing directional sign at junction. X height of sign 62.5mm. Mounting height from island to bottom of ign to be 2.1m.

   

Responsibility for works: Hampshire

   

Current status: Planned work about to start

   

Works reference: FF402222006481907111516

   

Sherfield Road, Bramley, Hampshire

16 July — 16 July

   

Delays possible Traffic control (two-way signals)

 

Works location: Next to railway crossing (arranged with Network Rail)

   

Works description: Removal of O2 Structure and cabinets using Crane located on The Street. Barriers around working area on road, Footway, at structure and cabinet locations. 1 day on site to complete works and reinstatement. Network rail are managing the level crossing.

   

Responsibility for works: O2 (UK) Limited

   

Current status: Planned work about to start

   

Works reference: MG02234334O2/BDLM

   

The Street, Bramley, Hampshire

15 July — 17 July

   

Delays possible Traffic control (two-way signals)

 

Works location: From outside Thorns to opposite the side of 2, BEAUREPAIRE CLOSE on THE STREET

   

Works description: TURGIS GREEN V5040 - PON 667922 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in FW/CW/Verge to facilitate spine cabling works.

   

Responsibility for works: Openreach

   

Current status: Advanced planning

   

Works reference: BC005MU1WSEP00WALCU90F02