1. |
14/03343/OUT – Aurum Crockford Lane Basingstoke Development of up to 130 no. residential dwellings, with associated access, parking and landscaping |
|
2. |
14/03531/ROC - Land Adjacent Incinerator Whitmarsh Lane Chineham Variation of Condition 2 of permission BDB/76751 to allow retention of workshop building and continued use of land for the stationing of vehicles and containers for a further temporary period of eighteen months |
|
3. |
14/03568/FUL - Qps House The Street Bramley Change of use from Class A2 to Class A1 (barber shop) |
|
1 |
14/01457/FUL - Clift Meadow, Minchens Lane, Bramley Construction of 3m wide combined footpath-cycleway with associated low level lighting and landscaping,erection of 2 new bridges, resurfacing and extension of existing car park and creation of new pedestrian access |
Granted |
2 |
14/01458/FUL - The Clift Surgery, Minchens Lane, Bramley Erection of single storey extension, provision of new vehicular access and additional car parking |
Granted |
3 |
14/01075/OUT - Land At OS Grid Ref 465296 159586 Minchens Lane Bramley Outline application for the erection of 200 open market and affordable dwellings with associated new vehicular and pedestrian accesses, estate roads, footpaths and cycle ways, public open space and surface water attenuation features |
Granted |
4. |
14/02843/FUL - 1 Moat Close Bramley Erection of attached two bedroom dwelling with access and parking to form two semi-detached dwellings |
Application Withdrawn |
5. |
14/03011/HSE - 5 St. Marks Close Bramley Erection of a single storey rear extension to include rooflights. Installation of bay window to front elevation with creation of roof to form storm porch. Conversion of loft to form living accommodation to include dormer window to rear |
Granted |
6. |
14/03086/HSE - Walmar The Street Bramley Single storey rear extension following demolition of existing lean to |
Granted |
7. |
14/03111/HSE - Lime Tree Cottage Vyne Road Bramley Demolition of existing brick wall and erection of new brick wall and fence |
Granted |
8. |
14/03119/LBC - Bullsdown Farm Bramley Alterations to planning application BDB/75376 to include rearrangement of internal layouts of Units C, D & E, alterations to finished floor level of Units C and E and minor change to elevation 2 (Unit C) |
Granted |
9. |
14/03307/LDPO - 78 Kirby Drive Bramley Certificate of Lawfulness for the proposed loft conversion incorporating 3 no. roof lights on the front roof slope and 5 no. roof lights on the rear roof slope |
Granted |
10. |
14/03085/HSE - 17 Wallis Drive Bramley Erection of first floor extension over garage and two storey rear extension following demolition of conservatory |
Granted |
11. |
14/03114/HSE - 58 Coopers Lane Bramley Erection of conservatory |
Granted |
1. |
14/02346/LBC & 14/02345/HSE - Beaurepaire Park Bramley Erection of new three storey plus attic and basement extension to side (south) elevation of existing house, to form new principal wing, following demolition of existing modern single-storey rear (west) extensions. Erection of new orangery to east of existing house and construction of new central pond, and new garden pavilion to west of existing house. Erection of twin bridges and lightwell to new basement to south flank of moat plus associated parking / turning area within moat and new drive south of moat. Replacement of existing north bridge. Construction of balcony and boat landing stage to west flank of moat. Erection of 2no. garages to north of moat, including associated parking / turning area. Relocation of tennis court to south of walled garden. Relocation of manège to north of existing indoor riding school. Associated landscaping works. |
No objections, but comments submitted |
2. |
14/02347/FUL - Beaurepaire Park Bramley Construction of new vehicular access onto Morgaston Road, and associated new sections of drive across park, and associated landscaping works |
No objections, but comments submitted |
3. |
14/03268/FUL - MoD Bramley Training Area Campbell Road Bramley Change of use of land and buildings for filming and associated activities for up to 60 calendar days per year |
No objections, but comments submitted |
4. |
14/03280/HSE - Windrush Coopers Lane Bramley Construction of first floor involving raising of the roof with dormer windows to the rear and side extensions. Erection of side and rear extensions |
No objections |
5. |
14/03385/AOP - Bridge Crossing Broad Street Cufaude Lane Bramley Alteration to the current single span structure of engineering brickwork supported on masonry abutments with 6 no. pre cast reinforced concrete portals on new cil beams. Installation of new handrail to each parapet, refurbishments and minor repairs to all associated sub-structures |
No objections |